James Vander Werf, Director of Purchasing, Hastings Manufacturing Co., LLC

We are completely satisfied with the Hi-Vac ductwork installation that Certified Sheet Metal recently completed at our facility.  Everyone involved did an outstanding job and the installation completely met our expectations.

Our initial contact was with Mr. George Regan.  We found George to be very knowledgeable, professional and pleasant to work with.  He represented Certified well and instilled confidence in us the Certified had the resources and competency to do a first rate job.  George followed the installation closely, was accommodating as the schedule shifted, and was able to keep the project on track.  George followed up on every detail from drawings to materials to assure the project met our requirements and was done correctly.

The installers were also impressive.  They worked around our equipment while minimizing any disruption to our operations.  Their workmanship was of the highest quality and the result was a first class installation.

We commend George and his crew for a job well done!


A Happy Owner-Client

The guys have been great following rules and safety.  Certified Sheet Metal has been raising their standards to keep up with our complex everchanging industry.  Your flexibility to deliver has been very well received.


Bruce Ungethiem, North American Regional Technical Manager, Mead Johnson Nutrition

The Construction Management team from BP&R Engineering and I were very satisfied with your work on the Achilles Project. Your professionalism and high quality workmanship helped contribute to some very high remarks during a recent internal quality audit conducted by our corporate staff.

Thank you and congratulations on a job well done.


Juan Brisita, Senior Engineer, Mead Johnson

Mead Johnson would like to take this opportunity to thank your company for the contributions made to the Bowen Dryer Project at the Zeeland Supply Center.

The construction time frame was compressed, the work area was congested, and the project schedule required off shift and overtime work. Your company worked through these project challenges, and helped make the Bowen Dryer Project a success.